Viewing 4 posts - 1 through 4 (of 4 total)
  • Author
    Posts
  • #12731
    adbel
    Participant

    most likely the engineer will need one attempt to build the bridge by solving known equations (newton equation)

    #12746
    iliyas
    Participant

    2

    #12747
    iliyas
    Participant

    They have to do many sample materials and compare the properties…

    #12748
    iliyas
    Participant

    Because the bridge is based on classical mechanics. Classical mechanics are called deterministic mechanics which means we can determine the possibility and behaviour of macroscopic stuff (brigde) in high precision. But on the another hand quantum mechanics are called non-deterministic mechanics which means we can only determine the probability of new properties, we cannot say the absolute change of property because a slight change between material will completely step us into new realm of science.

Viewing 4 posts - 1 through 4 (of 4 total)
  • You must be logged in to reply to this topic.
Scroll to Top