Answer question 3

Home › Forums › setting the stage › advantages question 3 › Answer question 3

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #15380
    maartengm
    Participant

    The difference is that building a bridge is a tractable problem, meaning you can reverse engineer from the desired output, back to the desired input.
    Material Design is not a tractable problem (yet): the desired outcome (room superconductor) has no path that you can trace back to desired input.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.
Scroll to Top