Although the process of building a bridge can be calculated with great precision, whether it is considered complete ultimately depends on human requirements. In contrast, the success of designing a superconductor is measured against clear, quantifiable objectives; however, performing such research remains challenging because the properties of materials are difficult to calculate accurately.