Viewing 1 post (of 1 total)
  • Author
    Posts
  • #12465
    Haseng Sani
    Participant

    Only once, because the design and analysis are conducted multiple times using software to ensure that the bridge will not collapse. This also helps save construction costs.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.
Scroll to Top